- Written request must be made before the award and within the statute's time limit, unless bidder instructions specify a longer period.
- The clock starts at bid opening, not submission, so record the exact date and time the bids were opened before anything else.
- Send the request to the agency that invited the proposals, not a subcontractor, supplier, or sales rep, even if it concerns the same job.
- If the agency denies your request, the deadline to contest in court runs from the date you receive the ruling.
A material quote may change, a subcontractor may back out, or a line item may be missing from your estimate. If you are an owner or estimator at a small electrical or HVAC firm, you may need to pull a public bid back before the agency awards the contract. Public bidding carries rules that a private quote does not, and some of those rules run on short clocks.
This post covers two deadlines in North Carolina's statute on withdrawing bids, along with a few related points from that statute and one rule from Virginia's code on bid bonds. It is general information, not legal advice. If the job is large or the stakes are high, read the statutes yourself and talk with a lawyer before you act.