There are two ways to arrive at a crew's budget, and they start from opposite ends.
The first is a top-down approach. Leadership sets a target — total labor for the year, total materials, total overhead — then breaks that target down to crews and line items. It is fast. It aligns quickly with the year's overall goals. It also risks producing numbers no one on the floor recognizes.
The second is a bottom-up approach. The crew and dispatch build the budget from actual job knowledge: hours by job type, material usage, equipment time, subcontractor needs. Leadership reviews and adjusts. It takes longer. It tends to produce a plan people trust.
A comparison of the top-down approach and the bottom-up approach lays out this general difference in OpenStax.
Picking one approach and living with it for the year leaves the plan untested. The better move is to run both against each other. A top-down pass gives you a ceiling. A bottom-up pass gives you a floor. The gap between the two is where you negotiate with reality.
Why does this matter to a dispatch lead specifically? Because dispatch runs on detail the top of the house never sees — seasonal crew availability, which equipment is due for service in the spring, which material lead times will bite in the fall. A budget built only top-down gives dispatch a number and no room. A budget built only bottom-up can drift away from what the year actually needs to deliver.
Pick your primary approach before the year starts. Then commit to a short review cycle so the budget does not rot in a drawer.