- Draw the zone on paper and mark its boundary on the ground before the first load leaves.
- Use an enclosed chute when debris goes more than 20 feet to outside the walls, and barricade any floor opening without one.
- Haul scrap out as the work progresses, not at the end of the week.
- Keep the lower area clear until debris handling stops above, and post falling-material signs at every level.
The eight rules below are a working structure you can adapt. Several come from the federal construction standard on disposal of waste materials, 29 CFR 1926.252, and those rules carry the exact requirements. The others are ordinary site practice. The standard does not spell them out, so treat them as your firm's habits, not as legal minimums. Some states run their own safety programs with their own rules, so check your local requirements as well.