- Verify that temporary covers are secured when installed so they cannot be displaced by wind, equipment, or employees.
- If covers are not color coded, mark them with the word hole or cover to warn of the hazard.
- Before crews begin work, confirm hole covers can support, without failure, a multiple of the combined weight of employees, equipment, and materials.
- When a guardrail surrounds a ladderway, provide a gate or offset the railing so a person cannot walk directly into the hole.
Verify that temporary hole covers can support at least twice the weight of employees, equipment, and materials that may be imposed on them at any one time, according to Washington State Legislature. Ensure barriers placed at openings are constructed and mounted to withstand a load of at least two hundred pounds applied in any direction except upward, with minimal deflection at the top rail, according to Washington State Legislature. Mark all temporary covers by color coding or displaying the word "hole" or "cover" to provide warning of the hazard, according to Washington State Legislature. Notify the owner or operator of high voltage lines at their business office at least two business days prior to the anticipated beginning of work, according to Oregon Occupational Safety and Health Division. Install structural members such as midrails so that no openings in the guardrail system exceed 19 inches wide, according to Legal Information Institute. These checks address specific load capacities, marking standards, and notification timelines required before work near high voltage lines.