Straight into the service manual page
WrenchQuarry
More

Florida home warranty contracts: 4 terms to check

WrenchQuarry Editorial Team · Published · 11 min read · How these guides are written

Florida home warranty contracts need assignment terms, timely delivery, a bold listing period notice, and bold exclusions with a front-page warning.

Key takeaways

  • Check the assignment notice and any transfer conditions.
  • Track delivery from the date coverage takes effect.
  • Inspect the listing period notice in the final document.
  • Review exclusions and the front-page warning together.

If you write or maintain home warranty contracts for Florida homes, you already know the document has to cover a lot: the price, what is covered, how claims work, and how the plan renews. Some of that is up to your company. Some of it is not. Florida's home warranty statute, section 634.312 of the Florida Statutes, lists things every home warranty contract must say, and in a few places it also says how the statement has to look on the page.

This post covers four of those requirements. They are easy to miss in a contract review: the purchaser's right to assign the contract after a sale, the deadline for getting the contract to the warranty holder, the boldface notice about listing period coverage, and the boldface exclusions disclosure with its front-page statement.

Each section below quotes or closely follows the statute and links to it. The quotes come from the 2025 text. Statutes get amended, so before you finalize any contract draft, open the current text and compare it with what follows. Treat this post as a guide to what to look for, not as a replacement for the statute itself.

Start with the statute text, not your old contract

Before you edit any contract draft, print the statute section and mark every requirement in it. Office drafts drift over time. A clause gets copied from an older contract, a line gets shortened to save space, and a notice gets reworded by someone who never saw the original. After a few years, the document in the drawer may no longer match the rule it was written to follow.

Starting from the statute keeps the review anchored to the rule rather than to whatever the old contract happened to say. For this post, mark four things: the assignment statement, the delivery deadline, the listing period notice, and the exclusions language. Then read each part of your draft against the marked text. If a part of the draft does not match the statute, fix the draft, not the statute.

Term one: the right to assign after a sale

The statute says home warranty contracts are assignable in a consumer transaction and that every contract must contain a statement telling the purchaser about the right to assign it. The statement has to cover the window of at least 15 days from the date the home is sold or transferred to a subsequent retail purchaser, and it has to cover all conditions on that right of transfer. Florida Senate, section 634.312

In a contract draft, that rules out vague wording such as "transferable upon sale." A notice can be short and still complete. If your contract places any requirement on a transfer, put that requirement in the same notice rather than in a separate policy document the buyer may never open. A buyer who reads only this one paragraph should be able to tell how long they have and what conditions apply.

Sales staff and listing agents often hear the transfer question first, so make sure they have the same wording the contract uses. If a seller asks how long a buyer has to assign the plan, the answer your team gives should match the notice. A mismatch between what staff say and what the contract says creates confusion that is easy to avoid, and it is much easier to fix in a one-page script than after a dispute.

The statute also addresses cost. It says the home warranty company may charge an assignment fee, and that the fee may not exceed $40. Florida Senate, section 634.312 Pay attention to the word "may." It does not require a fee, and it does not allow a higher one.

Drafting choice: put the notice and the fee amount in the same section, so a buyer sees both at once. That is a layout decision, not something the statute requires, but it keeps the two rules together for the reader. Whatever layout you choose, make sure the fee figure in the contract draft is the figure your company actually charges, and that the two match.

Term two: getting the contract to the holder within 45 days

The statute says every home warranty must be mailed, delivered, or electronically transmitted to the warranty holder within 45 days after the effectuation of coverage. It also says the application is part of the warranty contract document. The delivery duty is stated as subject to the insurer's or home warranty association's requirement on payment of premium. Florida Senate, section 634.312

Start with the trigger. The clock runs from the effectuation of coverage, which is the event the statute names. A first phone call from a buyer is not that event, and neither is the day someone drafts the document. Your intake process should record when coverage takes effect, so staff can count the 45 days from the right date. If the office only tracks the sale date or the date the paperwork was entered, the deadline may be measured from the wrong point.

Next, look at the methods. For electronic transmission, check how the holder will receive the document. Whatever method you use, keep a record showing when the document went out and how it was sent. If the timing is ever questioned, that record is what shows it. For another document handoff, see the field service work order checklist.

Then look at the application. Because the statute counts the application as part of the warranty contract document, a package that includes the contract but leaves out the application is not the complete document the statute describes. Build the send-out process so the application and the contract go together, and check that the copy a holder receives includes both. A quick check at the point of sending catches this far more reliably than a review months later.

The payment condition needs its own step. Write down which payment requirement applies to each plan your office handles, so staff can tell whether a delivery is on schedule under the rule that governs that plan. A simple status field in your file system is enough for this, as long as it is updated when the payment condition is met.

Batch sending can work, but check the calendar for each contract, not just the batch date. Check early-month contracts against their own deadlines before holding them for a month-end run.

Illustrative example: check a delivery batch

Suppose a contract has been waiting 10 days after coverage took effect. Before adding it to a batch, check its coverage date, applicable payment condition, application, and planned sending date. Record how and when it goes out. The batch schedule should follow that contract's deadline rather than replace it.

Term three: the listing period notice in boldface

The statute requires that all home warranty contracts state, in conspicuous, boldfaced type, that the home warranty may not provide listing period coverage free of charge. Florida Senate, section 634.312

Each part of that sentence affects the contract draft. "Conspicuous" means the notice has to stand out from the text around it, not sit in a dense block of fine print. Check the bold weight as well as the wording. A sentence that implies the coverage comes with the plan at no charge works against the notice the statute requires, even if the word "free" never appears in it.

The phrase refers to a listing period, which suggests a home being put up for sale. That is why this notice is easy to overlook. Sales staff and sellers may be the ones who discuss it, while the core plan terms are written for the buyer's day-to-day use. A contract draft built mainly around the regular plan can leave the notice out, especially if a listing-related page was added to the packet separately. Check the whole contract, including any add-on pages, cover sheets, and sales inserts, for this statement.

Check the format in the file you will actually send. Boldface can be lost when a document is converted to PDF, pasted from one program to another, or printed at a reduced size. Open the final version, look at the notice, and confirm it is bold and easy to see. Do not rely on the draft in your editing program, since the draft is the version least likely to show a formatting problem.

Keep the notice in one place rather than repeating it in slightly different wording across several documents. Repeated versions drift apart over time, and then the office is no longer sure which words the holder was given. If the same notice appears in a welcome letter, a contract, and a web page, decide which one is the master text and copy from it each time.

Term four: exclusions in boldface and the front-page statement

The statute says all home warranty contracts must disclose any exclusions, restrictions, or limitations on the benefits offered or the coverage provided in boldfaced type. It also requires a statement on the front page of the contract, in boldface, substantially similar to this sentence: "Certain items and events are not covered by this contract." Florida Senate, section 634.312

There are two requirements here, and each needs its own check. The first covers every exclusion, restriction, or limitation, not only the headline ones. The statute's wording is broad: it reaches restrictions and limitations on benefits as well as the exclusion of specific items. A bold section heading over several pages of text does not, by itself, show that every item beneath it is bold. Read through the body of the contract and check each limit you find, including the ones buried in a paragraph about how a claim is handled.

For the front-page statement, "substantially similar" gives you room to adjust the wording, but not the meaning. The point of the sentence is to tell the reader, before anything else, that some items and events are not covered. A softer line such as "some items may be limited" makes a different and weaker claim, and it would not match what the statute asks for.

Check the front page after every contract change. A new logo, a longer company name, a summary box, or an added line of instructions can push the statement onto a second page or make it lose its boldface. Treat the front page as its own item on the checklist, not as part of the general layout review, so that the statement gets a direct look every time.

The two requirements work together. The front-page statement tells the reader that exclusions exist, and the boldface disclosure in the body shows which ones they are. If your contract has the first but not the second, the reader is warned without being told what the limits are. If it has the second but not the first, the body is complete but the reader may never reach it. Review both as one pair. For a separate billing review, see manufacturer warranty billing checks.

Before the contract goes out

Once you have worked through the four terms, put the contract draft through a short final review. Start with a clean copy of section 634.312 and read it against your draft rather than against your memory of it. Memory of an older version is an easy way to miss a change, especially in an office that has reused the same contract for years.

Next, have someone who did not write the contract read the four terms cold. Ask them to find the 15-day assignment notice, the assignment fee amount, the 45-day delivery process as it applies to your office, the listing period notice, and the front-page statement. If they cannot find one of them quickly, a buyer may have the same trouble. A reader who has to hunt for a required notice is a reader who may not see it at all.

Then save a dated copy of the version you reviewed, along with a short note of what you changed. Offices that keep this record can show later which text was in use on a given date. That record also helps when the statute changes, because you can see which contract drafts need an update and which were already compliant when they were issued.

Finally, remember the scope of this post. It covers four requirements from section 634.312, and the same section contains other rules. For example, it says that if the contract is canceled by the association for any reason other than fraud or misrepresentation, the return of premium is based on 100 percent of the unearned premium calculated proportionally, less any claims paid on the agreement. Florida Senate, section 634.312 By July 1, 2011, each home warranty contract sold in the state must be accompanied by a written disclosure to the consumer that the rate charged for the contract is not subject to regulation by the office. Read the whole section before you treat any list, including this one, as complete.

This post is a guide to what the statute asks for. It is not a substitute for reading the statute or for asking a Florida attorney to review your contract before you use it.

General information, not legal or tax advice.

Today, open the final contract file and compare its notices with section 634.312, then save a dated copy of your review.

Questions about contract review

Where should the review begin?

Begin with the statute text, then compare it with the contract draft.

Which file should staff inspect?

Inspect the final version the holder will receive, including its application and any add-on pages.

What should staff save afterward?

Save a dated copy of the reviewed document and a short note of the changes.

Sources

More field guides