- Get written estimates for the project and electrical work.
- Confirm how the owner defines the electrical package.
- Save the public notice and final-action meeting date.
- Request prequalification procedures before preparing your package.
Some public projects must go out for a competitive award to an appropriately licensed contractor. Others can follow a different path. If you do not check which path applies before you start the estimate, you can spend a full day pricing a job you were never in a position to win, or you can miss a notice you needed to act on.
This post walks through three checks drawn from Florida law. Each one is a number or a deadline that you can look up, compare with the job in front of you, and write down before you commit to a bid. The rules come from Chapter 255 Section 20 of the 2025 Florida Statutes, which the Florida Senate publishes online. Everything below that is attributed to the statute comes from that page.
Two cautions before you use any of these numbers. First, the version linked here is the 2025 text, and it is now late in 2026, so pull the current text and confirm the figures still match before you rely on them. Second, these are Florida rules. If you bid public work in another state, look up that state's public construction statute and run the same checks against it. The thresholds and deadlines in one state do not carry over to another, and a number that protects you in Florida may mean nothing in a different jurisdiction.