2 heat-stress figures to set before outdoor tech work

WrenchQuarry Editorial Team · Published · 12 min read · How these guides are written

Set a 38°C body-temperature ceiling, a humidity point near 90 percent, and a heat reading before a tech works outdoors. That gets many days right and misses the ones that matter most, because the body does not run on the forecast. It runs on heat balance, and heat balance depends on air temperature, humidity, the physical work being done, and what the tech is standing on.

This post covers two figures worth setting before you send someone out. The first is the body temperature your plan is built around. The second is the humidity level where sweating stops doing its job. The heat reading you use, and what that reading can and cannot tell you, comes last. A further step, looking up the local climate normals, helps you judge whether a hot day is unusual for the place you are sending people. None of this replaces your safety program or your local rules. What it gives you is a short list of numbers you can write down, check, and act on.

The body temperature your plan protects

The body works to keep its core where it belongs. The Canadian Centre for Occupational Health and Safety states it plainly: "The body attempts to maintain a constant internal temperature of 37°C at all times." (CCOHS) When work in heat pushes more heat into the body than the body can shed, core temperature starts to climb. The tech may not notice the change right away, and neither may the people working next to them. That gap between how a person feels and what their body is doing is why a lead needs a number on the plan, not just a general sense of how the crew is doing.

The figure most useful to a lead is not 37°C. It is the ceiling above it. The same CCOHS page describes the limit set by the American Conference of Governmental Industrial Hygienists (ACGIH), which "specifies an action limit and a Threshold Limit Value (TLV®) to prevent workers' body temperature from exceeding 38°C (38.5°C for acclimatized workers)." (CCOHS) Two numbers come out of that sentence. The first is 38°C, the level the limit is meant to keep body temperature from exceeding. The second is 38.5°C, which applies to acclimatized workers. Write both on the job plan, and label which one applies to which person.

Plan anyone who is not known to be acclimatized against the lower number. Do not assume a new hire gets the higher figure, and do not assume it for someone who has been away from hot work for a while. You will not know the difference by looking at them.

A ceiling you cannot measure on a person is only useful if it changes what you do. You cannot read a tech's core temperature from across the lot. What you can do is shape the day so the crew never gets close to the ceiling. Settle the work and rest schedule before the shift starts. Make sure water and shade are set up before the first person clocks in, not after the first complaint. Put the heaviest tasks in the cooler part of the day when the schedule allows it. And give every tech a plain way to say they are not doing well, without that counting against them.

Heavy work deserves its own note. Carrying, lifting, digging, or climbing in full sun asks the body to make more heat than a walk-through of the same site would. Two jobs at the same air temperature can carry very different loads, so the number on the plan should always be paired with a description of the physical work. A tech on a light inspection and a tech hauling pipe in the sun are not on the same plan, even if they start the same hour.

Acclimatization is built, not declared

The 38.5°C figure depends on a word that is easy to skip past: acclimatized. Acclimatization is the body's gradual adjustment to heat. The CCOHS quote above ties the higher figure to acclimatized workers, which makes it a status a worker has, not a title on a badge. A lead cannot simply declare a tech acclimatized because they have a few years in the trade. Trade experience counts for something, but the crew's own history is what tells you whether the person has actually been working in heat recently.

In practice, that means keeping a simple record. Note who has worked outdoors in heat this season and who has not. Treat anyone returning from a long break, anyone new to the site, and anyone new to the trade as needing a gradual build-up. Start the first hot days with shorter exposure and lighter tasks, and watch those people more closely than the regulars. A crew that has been in the heat for a week differs from one that started yesterday, even when the readings match.

The reverse matters too. A veteran who has been off the job through a cool spring is not automatically ready for a heat wave. Recent exposure is what counts. When the first hot stretch of the year arrives, plan it as a new season and give the whole crew the same ramp-up, rather than assuming that everyone's tolerance survived the winter.

The humidity where sweat stops working

Sweat cools the body by evaporating, and evaporation is what carries the heat away. The CCOHS page gives the point where that stops: "Sweat evaporation stops entirely when the relative humidity reaches about 90 percent." (CCOHS) Above that point the body still sweats, but the sweat does little good. It runs off the skin, and the tech loses fluid without getting the cooling they were relying on.

That is why a humid day can be harder on a crew than a hotter, drier one. A lead who only watches temperature can miss the moment when the body's main cooling method has nearly stopped working. Relative humidity belongs on the job plan with the same weight as the temperature, and it should be written down the same way.

Check the reading where the work is, not the forecast for the nearest city. Relative humidity moves through the day. A humid early morning may clear by midday, and a dry morning may turn muggy by afternoon. Take a reading at the start of the shift, again when the heaviest work begins, and again whenever the crew moves to a different part of the site. Write down the number and the time. A log of readings tells you more on the third day than on the first, because it shows how the site behaves.

Sheltered spots need extra thought. Attics, crawl spaces, the inside of a truck box with the doors closed, and the lee side of a building can hold moisture and heat in ways an open lot does not. A reading from the parking lot may not describe the space where the tech is actually working. If the work happens in a confined or sheltered spot, take the reading there.

When a reading gets close to 90 percent, treat the day as one where sweat is not doing its job. That means changing the plan, not waiting for someone to fail. Shorten the stretches between breaks, move the breaks into shade or a cooler space, and ask the crew to check on one another more often. Consider whether the task can wait for a drier window. If the work cannot wait, put that decision in writing and make sure the lead, not the tech alone, owns it.

The heat reading and what it can't tell you

Many teams work from one heat number, such as an index on a card or an estimate printed in a safety binder, and that number is only useful within the conditions behind it. The CCOHS page sets those conditions. One can estimate WBGT and humidex from air temperature and humidity when radiant heat sources (hot and cold surfaces) are absent and air movement is less than 0.5 m/sec (100 feet a minute). (CCOHS)

The conditions have two parts. The first is radiant heat. The source names hot and cold surfaces as the things the estimate leaves out. A black roof, an asphalt lot, a steel tank in the sun, and a wall that has been baking all afternoon all put heat into a body in ways air temperature does not capture. A tech standing on asphalt in full sun is not in the same conditions as a tech standing in shade at the same air temperature. Cold surfaces count too, which is easy to forget in cooler months when the question is whether the estimate still applies. If the work is near any surface that is much hotter or colder than the air, a number built from air temperature and humidity alone is not the number to rely on.

The second condition is air movement. Air movement at or above 0.5 m/sec (100 feet a minute) means the estimate's conditions are not met, so take a direct reading rather than lean on the estimate. A light steady breeze below that does not by itself rule the estimate out. A still pit or an enclosed space may sit closer to what the estimate describes, but that is a matter of checking the conditions on the day, not assuming them.

The CCOHS page also compares two wet bulb readings: "The natural wet bulb temperature (on the WBGT apparatus) is approximately 2°F (1.1°C) higher than the wet bulb temperature measured using a psychrometer." (CCOHS) A psychrometer reading is therefore not a stand-in for a natural wet bulb reading from a WBGT apparatus. The gap is small, but it runs in one direction, and it matters when your log mixes sources. Pick the instrument your team will use, write its name on the plan, and keep using it so readings from different days can be compared. If someone brings in a reading from a different instrument, log it as that instrument, not as the team's standard number.

Shortcuts are where this goes wrong. If the job does not fit the estimate's conditions, the honest move is to take a measurement at the job. Adjusting an estimate by feel, or averaging a reading from the office with one from the site, produces a number that looks precise and is hard to trust. A reading that is labeled, timed, and taken where the work happens is worth more than a neat figure that came from somewhere else.

Climate normals for the week ahead

A reading tells you what is happening. Climate normals tell you what is usual, and that helps you decide how much attention a hot forecast deserves. The National Centers for Environmental Information's U.S. Climate Normals tool lets you search for "maximum, minimum, and average temperature normals and precipitation total normals for individual station locations from about 15,000 stations across the United States." (NCEI) Station-level data is more useful than a regional guess, because it lets you pick the reporting station closest to the job.

The page also explains which periods are available. Its Data Access Tool "has separate access options for both conventional 30-year (1991–2020) and supplemental 15-year (2006–2020) time periods." (NCEI) The tool lets you find station normals by station name at annual, seasonal, monthly, daily, or hourly intervals, so you can pull the value for the month you are planning for. A 30-year period averages over more years, and a 15-year period is closer to recent conditions. Choose one, write down which one you used, and keep using it from month to month so comparisons stay fair.

Here is how to use them. Before a summer job, pull the station closest to the site for the month of the work and look at its typical highs and lows. Compare those with the forecast. If the forecast runs well above what is typical for that month, plan more conservatively even before any reading reaches a figure, because the crew is likely to be working in conditions they do not see often. If the forecast matches the typical picture, your standard plan probably covers the week, but the readings on the day still decide.

Normals are averages, not forecasts. They do not tell you what the site will be like at two in the afternoon on a particular Tuesday. A station many miles away can also describe a different climate, especially where the land changes quickly between low ground and high ground. Note the station name on the plan. If the site is far from it, say so, and lean harder on readings taken at the work location.

If your sites are outside the United States, look for the national weather service equivalent in your country and use the same approach: pick the closest reporting station, note the period it covers, and compare it with the forecast.

Putting the figures on the job plan

Pull the pieces together into one sheet the crew can see. Write the body ceiling at 38°C, and write 38.5°C only next to the names of workers known to be acclimatized. Write the humidity point at about 90 percent, the level where sweat evaporation stops. Write the reading you are using, the instrument behind it, the time it was taken, and the place. Note the station and period you used for the normals. A sheet like that is quick to fill out, and it turns a vague sense of the day into something the crew can check.

On the day, check the readings at the points you listed, and compare them with the figures before work starts and again as it goes. When a reading moves toward a figure, change the plan before someone complains. The changes are the ordinary ones: more frequent breaks, shade and water staged at the work rather than back at the truck, the heaviest tasks moved to the cooler part of the day, a second person assigned to watch the crew, or a decision to stop for the day. Make each change in writing, so the crew knows what changed and why.

Who makes the call? Name one person on each crew who has the authority to stop work, and make it clear that stopping is part of the plan, not a failure. A tech who has to argue for a break is working at a disadvantage. The lead should not be the only person watching, either. Crews work best when people look out for one another, and a short check-in at each break gives the team a chance to say what they are noticing.

At the end of the week, review the log. Look at where the readings sat compared with the figures, which breaks were taken and which were skipped, and where the plan felt too loose or too tight. Use that review to adjust the next week's plan, and keep the sheet with the work order (see Field Service Work Order Checklist for Dispatch Handoffs) so it is there the next time someone asks what the crew was told.

Finally, check the figures here against your own safety program and local rules, and bring in whoever owns that program if they disagree with anything in this post. The figures are a starting point for the conversation with your crew, not a complete heat plan.