3 Michigan sworn statement entries a sub must get right

WrenchQuarry Editorial Team · Published · 10 min read · How these guides are written

A Michigan subcontractor's sworn statement turns on three entries: a complete list of subcontractors and suppliers contracted relative to the improvement, correct handling of stock against purchased material, and the fraud warning attached to your signature.

  • List every subcontractor and supplier you contracted with relative to the improvement — no shorthand allowed.
  • Inventory stock not purchased specifically for the contract does not have to be listed; material bought for the job does.
  • A printed fraud warning attaches criminal penalties to a false statement given with intent to defraud — check every line before signing.
  • A relying party cannot use your statement to avoid a claim once a notice of furnishing has been provided or excused under sections 108 or 108a.
  • The quoted provisions set no due date for an owner or lessee demand — ask the requesting party for their deadline and confirm it in writing.

What triggers your sworn statement duty

You owe a sworn statement in two separate moments on a Michigan job. The first is when payment is due from the contractor, or when you ask the contractor for payment yourself: "A subcontractor shall provide a sworn statement to the contractor when payment is due to the subcontractor from the contractor or when the subcontractor requests payment from the contractor" (MCL 570.1110). The second is an owner or lessee demand. That demand puts a duty on you only when the owner or lessee has made it and, where subsection (6) applies, has done what that subsection requires of them. Treat the contractor request as the everyday trigger. Treat the owner demand as the one that arrives late, often under pressure, and always deserves a fast, careful reply.

Both moments share the same underlying logic. A sworn statement is a formal, sworn account of who you contracted with on that improvement. It sits upstream of payment decisions made by people who are not standing in your truck. That is why the content of three specific entries decides whether the document does its job or hands someone a problem.

Team leads feel this most. You assemble the list of subs and suppliers as work proceeds, then get asked for the statement at the end of a billing cycle with no warning. Owners and office staff who receive these statements feel it from the other side: they must decide whether the document in front of them is complete enough to rely on. Both roles need the same three entries right.

The first entry: every subcontractor and supplier you contracted with

The statute does not offer a shorthand here. Your sworn statement "shall list each subcontractor and supplier with whom the person issuing the sworn statement has contracted relative to the improvement to the real property". Read that as a completeness test, not a formatting preference. If a supplier delivered material for this improvement under a contract with you, that supplier belongs on the list. If a specialty sub ran conduit or set blocking under an agreement with you, that sub belongs on the list.

Scope the list to the improvement at hand. Work you did on a different property, or supply you bought against a standing account for general stock, does not belong on this statement. The dividing line the statute draws is the contract "relative to the improvement to the real property." Keep your list tied to the job address and scope you were engaged for.

Here is where field teams lose time. By the time a statement is due, the paper trail sits in three places: purchase orders in the office, text threads with suppliers, and signed sub agreements in a folder. Walk through the job scope in order of work. Every trade you engaged, every supplier you ordered from, gets a line. If you cannot decide whether someone was contracted relative to this improvement, ask the project owner of that scope before you sign the statement.

Owners receiving the statement benefit from the same discipline. A list with holes undermines the document's purpose downstream, because subsection (8) exists to let a relying party avoid another party's claim by standing on a prepared sworn statement. That protection only carries weight if the statement covers the field it claims to cover.

The second entry: what you deliberately leave off, and why

Material from your own inventory needs a different treatment. The contractor or subcontractor "is not required to list in the sworn statement material furnished by the contractor or subcontractor out of his or her own inventory that was not purchased specifically for performing the contract".

In practice, this means stock you carried before this job and pulled from the shelf does not have to appear as a purchased supply line. Material you bought specifically to perform this contract does. The distinction turns on why the material left your inventory, not on how much of it you used.

Team leads: run this as a two-column check before you hand the statement up. Column one, material bought for this job. Column two, material pulled from stock. Column one drives your listing decisions under subsection (4). Column two is the carve-out under subsection (5). A supplier invoice dated after the job award that references the job address is a strong signal for column one. A stock transfer from your yard with no job reference usually signals column two.

Owners and office staff receiving these statements rarely see the two columns. You see only the final list. That is why the subcontractor's internal check matters: once a statement is signed and delivered, correcting an omission means going back through the requesting party's process, which slows everyone down.

Two practical habits help. First, flag stock pulls in your own production notes as they happen, not at billing time. Second, if you use both inventory stock and purchased material on one job, confirm which lines your statement will show before you sign. The rule is clear about what you are not required to list. A list that includes stock pulls invites questions about why they appear.

The third entry: the fraud warning printed on the document

The sworn statement form carries a built-in warning. It reads, in full: "WARNING TO DEPONENT: A PERSON WHO GIVES A FALSE SWORN STATEMENT WITH INTENT TO DEFRAUD IS SUBJECT TO CRIMINAL PENALTIES AS PROVIDED IN SECTION 110 OF THE CONSTRUCTION LIEN ACT, 1980 PA 497, MCL 570.1110". That sentence is the third entry a sub must get right, because the penalties it names apply only to a false sworn statement given with intent to defraud.

The warning turns accuracy into a personal matter for whoever signs. Sign only what you have checked. If the list is long and you inherited the job from a previous project lead, check it line by line before you sign.

Team leads: build a two-minute habit. Read the list out loud against your purchase orders. Confirm no line is inflated, no supplier is duplicated to pad the number, and no stock-purchase claim is wrong. The intent element in the warning matters: the statute attaches criminal penalties to a false statement given with intent to defraud. Careful, honest work under time pressure is exactly what the process asks for.

Who can rely on your statement, and where a notice of furnishing still sits

Subsection (8) gives the relying party their protection. An owner, lessee, designee, mortgagee, or contractor may rely on a sworn statement prepared by someone else to avoid the claim of a subcontractor, supplier, or laborer — unless the subcontractor, supplier, or laborer has provided a notice of furnishing as required under section 109, or the notice of furnishing is excused under section 108 or 108a. For a subcontractor, this is the part of the picture that shapes how your statement and your notice of furnishing interact.

Read the subsection as a condition on reliance. The relying party's shield holds only while the notice-of-furnishing exception does not apply. If a notice of furnishing has been provided, or if sections 108 or 108a excused it, the relying party cannot use the sworn statement to avoid that claim on those grounds. Your accurate listing and your notice-of-furnishing practice are two separate lines of protection. Keep both current.

Owners and office staff: this is why the statement and the notice records travel together in a well-run file. A statement alone tells you who the subcontractor contracted with. The notice record tells you which claims the relying party may still have to contend with. Both must be checked before you close out a payment decision.

The subsection also names mortgagees and designees among the parties who may rely on the statement. On jobs with financing in place, your statement may reach a party you never spoke to. That widens the audience for your accuracy well beyond the contractor's AP desk.

How to answer an owner or lessee demand

An owner or lessee demand puts you under a second duty. The demand has to come from or on their behalf, and where subsection (6) applies, they have to have done what that subsection requires. Once both conditions hold, the sworn statement obligation attaches to you just as it does for a contractor payment request.

The practical difference is pace and audience. Contractor requests usually arrive on a billing rhythm you already know. Owner demands often arrive with a deadline attached by someone else's schedule. Keep a prepared structure for your list ready — job address, scope reference, and your listing columns — so the response time is spent verifying, not formatting.

Team leads: name the person who owns this response in your crew. If it is you, keep your purchase-order file with the job. If it is your office, give them the two-column check from the inventory section so they can run it without you. The fastest wrong answer to an owner demand is a list assembled from memory.

Table: what each duty asks of you

Here is a compact view of the three duties the statute sets for a subcontractor's sworn statement.

DutyTriggerYour obligation
Statement to contractorPayment due, or you request paymentProvide the sworn statement
Statement to owner or lesseeDemand made, plus subsection (6) conditions metProvide the sworn statement
Statement contentAny sworn statement you issueList each subcontractor and supplier contracted relative to the improvement

Use this as a desk reference when a request lands. It does not replace reading the full section, but it does tell you which question you are answering: to whom, on what trigger, with what content.

Checklist before you sign

Run this list before your signature goes on the statement.

  • List completeness: Every subcontractor and supplier contracted relative to this improvement appears.
  • Stock against purchased: Inventory stock not bought for this contract is excluded from the purchased-material lines.
  • Scope tie: Each listed party ties to the improvement address and scope you were engaged for.
  • Warning read: You have read the fraud warning printed on the document and understand it attaches to your signature.
  • Notice records: Your notice-of-furnishing practice is current for this job, given subsection (8)'s conditions on a relying party.
  • Audience check: If the request came from an owner or lessee, confirm the demand conditions hold before you respond.

Team leads can run the first four lines alone. The notice-record line needs your office. The last line protects you from responding to a demand that did not carry its own conditions.

Field notes from jobs where the list went wrong

A statement assembled late, from memory, tends to miss a supplier who delivered early and quietly. The supplier's line vanishes. Months later, when a relying party leans on the statement, the gap becomes visible to everyone at once. Build the list as work proceeds, not when the request arrives.

A second pattern: a stock pull entered as a purchased line because the invoice was close by. The carve-out under subsection (5) exists precisely so you are not forced to list stock you carried. Getting that line wrong in either direction invites questions about the rest of the document. Keep your two-column habit current through the job.

A third pattern: the owner demand arrives while your contractor request is still open. You now owe two statements, to two audiences, about one job. Run the same list once, check it once, and deliver it to both. The content duty does not change with the audience. Only the trigger and the recipient change.

The one question your sources leave open

The statute tells you when the duty attaches and what the statement must contain. The quoted provisions set no due date for returning an owner or lessee demand. Ask the requesting party what deadline they are working to, and confirm it in writing before you start assembling. That single question keeps the rest of your checklist on a schedule you control.