Minnesota bond act: 2 exemptions for buses and roads

WrenchQuarry Editorial Team · Published · 11 min read · How these guides are written

Two exemptions in Minnesota's Public Contractors' Performance and Payment Bond Act cover transit bus manufacturers and routine town-road maintenance work. Both live in Sec. 574.26 and apply across sections 574.26 through 574.32.

  • Bus exemption: applies to a manufacturer producing at least 100 public transit buses in a calendar year, where "public transit bus" means a vehicle with design capacity over 40 passengers including the driver; school buses are excluded
  • Road exemption: covers snow removal, ice removal, grading, and similar routine maintenance on town roads only — not county roads, state highways, or city streets
  • Construction work (new culverts, new alignments, replacement, reconstruction) pulls you back under the act even on a town road
  • The exemption removes the statutory requirement, but a bond clause written into your contract as a term is a separate negotiation
  • Settle the bond question at bid time, and note that Sec. 574.26 allows reasonable attorneys' fees, costs, and disbursements in a successfully maintained action to enforce claims under the act, so an unpaid claim carries added exposure

Who this post is for

You bid work in Minnesota. Maybe you plow town roads in winter. Maybe your shop does grading and patching for a township board. Maybe you build or supply public transit buses for a transit authority. Either way, someone has told you that you need a performance and payment bond on the job. That is usually right. But two parts of the Public Contractors' Performance and Payment Bond Act may not apply to you, depending on your bus count, road class, and scope, and knowing which one fits saves you a bond premium, a surety submission, and a lot of back-and-forth with your underwriter.

This post walks those two exemptions in plain words. It covers what the act is, who it binds, how the bus exemption works and where its limits sit, how the road-work exemption works and where its limits sit, and what to do at bid time when a public body sends you a bond form anyway. If you own or dispatch for a small firm that touches Minnesota public work, this is the page to read before your next bid package hits the desk.

What the act is, in one line

The Minnesota Legislature's Revisor of Statutes publishes the governing section at Sec. 574.26, Minnesota Statutes. The section gives the law its own name: "Public Contractors' Performance and Payment Bond Act," and the rest of the sections in the group are referred to as simply "the act." The act runs across sections 574.26 through 574.32.

That is the default. The two exemptions below carve holes in it. Both live in the same section, 574.26, and both apply to the whole group of sections, not just to one narrow rule.

The two exemptions, side by side

Here is the comparison at a glance, built only from the statutory text in Sec. 574.26:

ExemptionWhat it coversWho it applies to
Bus manufacturersPublic transit buses only, with a defined passenger capacity and a stated annual production floorA manufacturer that makes at least 100 public transit buses in a calendar year
Town-road maintenanceSnow removal, ice removal, grading, or other similar routine road maintenanceContractors on town roads only

Work through the bus exemption first, then the road exemption. Each has a boundary you can miss.

Exemption one: the bus manufacturer carve-out

Sec. 574.26 states that the sections 574.26 through 574.32 "do not apply to a manufacturer of public transit buses that manufactures at least 100 public transit buses in a calendar year." Two conditions sit in that sentence, and both must hold. First, you must be a manufacturer. Second, your calendar-year output must reach at least 100 units. Miss either, and the act binds you like any other contractor on a public job.

The statute then defines its key term so you know exactly which product line qualifies. For purposes of this section, "public transit bus" means a motor vehicle designed to transport people, with a design capacity for carrying more than 40 passengers, including the driver. That phrase, "including the driver," is the one that trips people up. The 40-passenger ceiling counts the driver against it. A bus with a design capacity of 40 does not.

The definition also draws a hard line on what is excluded. The term "public transit bus" does not include a school bus, as defined in section 169.011, subdivision 71. So a shop that builds school buses for a Minnesota district stays inside the act, no matter how large its annual volume. If your line mixes transit and school buses, count only the transit units toward the 100 floor, and count them on a calendar-year basis.

That calendar-year basis matters at bid time. A manufacturer sitting near its limit in October does not know yet whether it will clear 100 by December. In that window, the safe move is to treat the act as live and price the bond. Once the year-end count is settled, confirm with the public body how the calendar-year test applies to your next contract. Ask your controller for the running count before you sign a bond waiver, not after.

The exemption also has a shape. It attaches to the manufacturer, not to the contract. A manufacturer at the threshold walks away from the statutory bond requirement on every public contract in the state, including a small one. A shop below the threshold does not get that exemption, though the town-road maintenance exemption can still cover it. That is why the annual count is the single number to track.

What the bus exemption does not cover

Three gaps sit around the carve-out.

The first gap is the definition boundary. Anything under or at 40-passenger design capacity is outside "public transit bus," so the exemption cannot reach it. A shuttle-style vehicle, a cutaway with a small body, a small van-based people mover, none of these clear.

The second gap is school buses. The statute points at section 169.011, subdivision 71 for the definition, and excludes them by name. A school bus maker still posts a bond.

The third gap is role. The exemption names a manufacturer. A dealer, a body-upfitter, a parts supplier, or a maintenance contractor on a transit contract may not qualify as a manufacturer, so check the statute or the public body. If you resell buses someone else builds, do not read the exemption as yours.

Also keep in mind that a bond can still show up in a contract even when the act does not require it. The public body may write one in, or a prime may flow one down. The exemption removes the statutory floor. It does not delete a bond clause your customer typed. Read the contract. If the bond clause cites the act, the exemption is your argument. If it cites nothing, you are negotiating a contract term, not a statute.

Exemption two: routine town-road maintenance

Sec. 574.26 also states that the sections 574.26 to 574.32 "do not apply to contracts for snow removal, ice removal, grading, or other similar routine road maintenance on town roads." This is the one that matters most to snow crews, graders, and small road contractors who work for townships across Greater Minnesota.

Four words carry the load. The first two are "town roads." The exemption is tied to the road class, not to the size of the contract or the public body. Work on a county road, a state highway, or a city street does not fall in. If you plow for a county or bid a city street job, the act applies as written.

The third word is "routine." The listed activities are framed as routine maintenance. Snow removal and ice removal are named outright. Grading is named. Then the statute opens the door to "other similar routine road maintenance." That phrase sweeps in work that behaves like the named items: patching, ditching, brush cutting along the right-of-way, surface patching, similar upkeep. It does not sweep in construction.

The fourth word is the list itself. Snow removal, ice removal, grading. If your scope is snow removal, ice removal, grading, or similar routine maintenance on a town road, the exemption applies.

Dispatchers should note the seasonal shape of this one. A winter contract that does nothing but plow and sand a town road fits. A spring contract that does nothing but grade a town road fits. A summer contract that digs a new culvert across the same road does not. The season does not matter. The scope does.

Where the road exemption stops

Read the exemption as covering routine maintenance on town roads, not all town-road work. It does not. It covers routine maintenance work on town roads. Construction on the same road, by the same crew, under the same township, pulls the bond requirement back in. The line between the two is a scope question, and it lives in your bid documents.

When the scope mixes both, the safe read is that the act applies to the job. A contract that bundles a plow route with a culvert replacement is not a pure maintenance contract. If you want to argue the exemption, separate the contracts at bid. Ask the town clerk to split the maintenance piece and the construction piece into two purchase orders. Ask the town clerk about splitting the maintenance piece and the construction piece when you bid rather than after award.

Your paperwork matters too. Keep the scope sheet, the bid, and the purchase order aligned. If the purchase order says "road construction" and the scope sheet says "grading," you have handed the argument to the other side. If the clerk writes a different scope into the award than the one you bid, raise it before you sign.

What happens if you skip a bond you actually owed

Here is the part small firms skip. If the act applies and you did not post the bond, you are not just out of compliance. You may still face a claim. Sec. 574.26 provides that reasonable attorneys' fees, costs, and disbursements may be awarded in an action to enforce claims under the act if the action is successfully maintained or successfully appealed. A claimant who wins may be awarded reasonable attorneys' fees, costs, and disbursements on top of the underlying amount. A contractor who posts late or posts short can end up funding both the claim and the other side's legal bill.

That cuts both ways. If you posted a bond in the wrong amount or let it lapse mid-job, the exposure is bigger than the invoice. Either way, the bond question is not a paperwork chore. It is a line item with a tail.

This is also why the exemption question gets settled at bid, not at claim. By the time a dispute is live, everyone has lawyers, and the fee language is already in play. The cheap moment to resolve the question is the morning you assemble the bid package.

What to do at bid time

A practical sequence for a small firm bidding Minnesota public work:

Check the road class first. If the job sits on a town road and the scope is snow removal, ice removal, grading, or similar routine maintenance, the exemption is on your side. Note it in the bid, cite Sec. 574.26, and hold the line if a bond form arrives anyway.

Check the scope line. Read the scope sheet word for word. Look for construction language: new culvert, new alignment, replacement, reconstruction, structures. Any of that pulls you back under the act even on a town road.

Check your own calendar-year count if you are a bus manufacturer. Confirm the transit units only, school buses excluded, and count on a calendar-year basis. Keep the running count where your controller can produce it in a day. Do not rely on a memory of last year's number.

Check the bond clause against the statute. A clause citing the act gives you the exemption as a basis for argument, but the clause remains a contract term you negotiate. A clause that names nothing is a contract term, and you negotiate it. Those are two different conversations with two different people.

Ask when the source leaves a gap. If your scope sits on the line between routine maintenance and construction, or your product line sits near the 40-passenger mark, call the public body's contracts office or your own attorney and get a written answer before you bid. One plain sentence from them beats a year of dispute later.

FAQ

Does the bus exemption cover a body builder or a parts supplier? No. The exemption names a manufacturer of public transit buses.

Does the road exemption cover county roads or city streets? No. The statutory text ties it to town roads. Work on a county road, a state highway, or a city street keeps the act in force, whatever the scope.

If one part of my town-road contract is construction, does the whole contract lose the exemption? The safer read is yes, the act applies to the job. Separate the maintenance piece from the construction piece into two purchase orders before you sign, and each piece can stand on its own terms.

Can the public body still demand a bond even when the exemption applies? The exemption removes the statutory requirement. A bond written into your contract as a term is a separate question. Read what the clause cites, and negotiate on that basis.

What if a sub sues me under the act and I posted no bond? Sec. 574.26 allows reasonable attorneys' fees, costs, and disbursements to be awarded in a successfully maintained or successfully appealed action to enforce claims under the act. Your exposure can run past the invoice amount. Settle the bond question before a claim arrives, not after.

General information, not legal or tax advice.