Straight into the service manual page
WrenchQuarry
More

Two tests decide which crew counts on public works

WrenchQuarry Editorial Team · Published · 11 min read · How these guides are written

Two plain tests decide which crew members count on a public works job: whether the work happens on the site of the building or construction job, and whether the project itself falls under a prevailing wage trigger. Run both against your contract and crew sheet before assigning pay rates.

  • Trigger test: Public works rules switch on when a condition attaches to the contract, such as federal funding for part of the work or a local authorisation of the project.
  • Secondary sites: The federal definition includes the main address where the work will remain plus a secondary site where a significant portion of the work is built.
  • Split shifts: Track hours by task and site when a worker splits a day between a covered site and a private job; only the covered hours carry the prevailing rate.

Start with the two tests

You have a public works job in the schedule. Some of your people must be paid the prevailing wage rate. The rest do not. Getting this wrong costs money in back pay, and it costs trust with the agency if an inspector finds it. The good news is that the question usually comes down to two tests you can run on a crew sheet in a few minutes.

Test one: is the work on the site. Only workers directly employed by a contractor or subcontractor in actual construction work on the site of the building or construction job count as being employed on public works. That is the rule set out in the Missouri statute at Missouri Revisor of Statutes, section 290.230. Run this test by drawing a line around your job site and asking whether each person's daily tasks fall inside it.

Test two: does the project fall under a prevailing wage trigger. Public works rules switch on when the right condition attaches to the contract. The Maryland statute, section 17-202, contains a condition on federal money for part of a public work contract. If the federal government provides money for a part of the public work contract, the contractor must pay the prevailing wage rate on that part as determined by the United States Secretary of Labor. The Maryland statute text at Maryland General Assembly, section 17-202 states this condition. Run this test against the contract paperwork before you send a crew.

These two tests do different work. The second one tells you whether the job is a prevailing wage job at all. The first one tells you which of your people are on it. You need both answers to assign the right pay rate to the right person.

How the site test works

The site test is the one you use every day, because it depends on where people stand and what they do with their hands. The Missouri rule ties coverage to work on the site of the building or construction job. So the first move is to mark the site clearly in your own records.

Think about a truck driver who delivers gravel. He drives to the gate, dumps the load, and leaves. Under the site rule as written, his transportation of the material to the site is a different activity from construction work on the site. He would not be counted as working on public works just for that trip.

Now think about a hauling crew that delivers prefabricated sections and also bolts them in place as part of the build. The Missouri statute covers this dual capacity directly: when the hauling of materials or equipment includes some phase of construction other than the mere transportation to the site, workers engaged in that dual capacity are deemed employed directly on public works. The same driver who also installs is covered; the driver who only hauls is not.

The federal construction wage rules draw a similar boundary around what counts as the site. They include the physical place where the building or work will remain, plus a secondary site where a significant portion of the building or work is constructed, both part of the site of the work. That secondary site is covered as part of the definition at Acquisition.gov, FAR subpart 22.4. This matters if your crew prefabricates in a yard and then sets the product in place. The work done at that yard on parts destined for this job can fall inside the site definition.

Use these points to mark your own site boundary:

  • The main address where the building or work will remain is in.
  • A secondary shop where a significant portion of the work is built can be in.
  • A haul that includes construction activity beyond plain transport can be in.
  • A haul that is only transport to the gate is out.

When a crew member's day mixes activities from both columns, count only the hours on covered tasks or sites as covered, tracking the split by task and site. The safer read is the one your inspector will take, and the statute language supports it.

The project trigger test

The site test only matters once you know the job is a prevailing wage job. That answer comes from the contract, not from the crew sheet. Several conditions can switch the rules on.

Federal money is one of them. If the federal government provides money for a part of a public work contract, the contractor must pay the prevailing wage rate on that part as determined by the United States Secretary of Labor. Check the funding page of the solicitation and the wage determination attached to the award. The part with federal money carries the requirement. The part without it does not.

A local authorisation is another condition in Maryland. Under that state's statute, the local-authorisation condition applies to the construction of a structure or work only if a political subdivision, Baltimore City, or the Revenue Authority of Prince George's County authorises that the construction is subject to it. Ask the awarding agency for that authorisation in writing before you set pay rates. The Maryland statute text carries this condition at the link above.

A mechanical services contract can also pull the subtitle in. The same Maryland statute applies the subtitle to a mechanical systems service contract that is part of a public work contract with a value over the threshold it names. Read the threshold line in the statute itself before you price the job, because the threshold is the number the rule hangs on.

There is one condition the sources leave open: what to do when a contract mixes a federally funded part with a state or locally triggered part, and the wage determinations differ. Ask the awarding agency's contract officer which determination controls the overlap. Get the answer in writing and keep it with the job file.

Compare the trigger conditions

Here is the trigger test laid out side by side, drawn from the statute text linked above.

ConditionWhat it switches onWhere it is written
Federal money in a public work contractPrevailing wage rate on that part, as determined by the United States Secretary of LaborMaryland statute, section 17-202
Local authorisation of a construction projectThe prevailing wage subtitle for that structure or workMaryland statute, section 17-202
Mechanical services contract inside a public work contract over the thresholdThe prevailing wage subtitle for that contractMaryland statute, section 17-202

Mark your crew sheet

Now put the two tests to work on the roster. The goal is one column on your time sheet that shows the pay rule for each person each day.

Start with the trigger test. If the contract shows federal money, write the prevailing wage flag on the job file. If a local authorisation letter sits in the file, write it there too. If the mechanical services piece is in scope, mark that as well. One job can carry more than one flag, and each flag travels with the job.

Then work down the roster. For each name, ask the site test. Is this person's work on the site of this building or construction job, including any secondary site where a significant portion of the work is built? If yes, the prevailing wage rate applies to that person for the hours worked on that site.

Ask the dual-capacity question next. Does this person haul materials or equipment and also perform some phase of construction beyond plain transport to the site? If yes, count the person as directly employed on public works for those hours.

Watch for the edge case of a worker who splits a shift between this public works site and a private job across town. Track hours by task and site. The hours on the covered site carry the prevailing rate. The hours on the other site do not. Write the split on the time sheet so an inspector can follow it.

What the rules say about volunteers

One more line on your roster matters. The Missouri statute bars forcing, compelling or otherwise intimidating a worker into performing otherwise prevailing-wage work as a volunteer. The Missouri statute is blunt on this point: under no circumstances may an employer or a public body force, compel or otherwise intimidate a worker into performing work otherwise paid at a prevailing wage rate or at a public works contracting minimum wage rate as a volunteer.

In practice, that means an invitation to help out on a covered site carries the same pay rate as a scheduled shift. Pay the hour, or send the person home.

This rule also shapes how you talk to the crew. Ask for overtime on a covered site and confirm in the applicable statute or contract how the overtime rule applies. Make that clear before the hours run, not after the time sheet closes.

Price changes and wage adjustments

Jobs run long, and wage determinations move. Your bid has to account for that. The federal price adjustment clause at Acquisition.gov, FAR 52.222-30 lists several categories that can drive an adjustment, including an increase in wages and benefits resulting from any other requirement applicable to workers subject to the Construction Wage Rate Requirements statute.

Read that clause in your own contract file before you sign. It tells you which wage movement is inside the adjustment formula and which is not. Keep the wage determination you bid against, dated and filed, so you can show an inspector which version your rates came from.

If your contract carries an adjustment clause, track the determination updates on a calendar. When a new determination drops, check your crew pay rates the same week. A lag between the new rate and your payroll is how back pay claims start.

The daily discipline

Both tests fail when they live in a binder instead of on the time sheet. Build a short daily habit:

  • Flag the job once. Write the trigger conditions on the job file when the award lands.
  • Check the roster daily. Walk the site test down the crew list each morning.
  • Mark dual capacity. Note any person who both hauls and builds.
  • Record site splits. Track hours by site when a person works two jobs in a day.
  • File the determination. Keep the wage determination you bid against with the job file.

This habit takes a few minutes a day. It saves a full audit later.

Questions crew leads ask

Does a foreman who rides between two sites count on both? Only the hours on the covered site carry the prevailing rate. Track the split by hour and site on the time sheet. The site test decides it, not the job title.

What if the subcontractor's workers are not our employees? The site test in the Missouri statute reaches workers directly employed by a contractor or subcontractor. If their work is on the site, it counts. Check the subcontractor's pay records during your weekly review.

Does a delivery driver who only drops material at the gate count? Transport to the site on its own does not make the trip covered work. If the driver also performs some phase of construction beyond the transport, the dual-capacity rule pulls that person in.

Is a secondary fabrication yard always part of the site? The federal definition includes a secondary site where a significant portion of the building or work is constructed. Ask the contract officer which locations your job carries before you set rates for work done there.

Who sets the actual rate for each classification? The Secretary of Labor's determination sets the federal rate. Keep that document with the job file.

A short checklist before you assign the crew

Before the first day on a public works job, run this list:

  1. Does the contract carry federal money, a local authorisation letter, or a mechanical services piece over the threshold? Mark each one on the job file.
  2. Which locations count as the site for this job? Include the main address and any qualifying secondary fabrication site.
  3. Which crew members work only on those sites? Flag them for the prevailing rate.
  4. Which crew members haul and also build? Flag them for the prevailing rate on those hours.
  5. Which crew members split hours with a private job? Set the split on the time sheet now.
  6. Is the wage determination you bid against filed with the job? Date it and keep it there.

Recheck this list as the roster, job conditions and wage determinations change, the way you recheck the daily habit above. They become a column on your time sheet, and your payroll matches the crew sheet without a scramble at month end.

General information, not legal or tax advice.

Sources

More field guides