- A roof pitch over 25° falls under the rule that roof ladders should be used, so the measured pitch belongs on the job sheet.
- Ladders and stepladders should be of industrial quality and rated at not less than 120 kg, so the rating is checked at truck loadout.
- The platform minimum is 675 mm and the crawl board minimum is 450 mm. Each access route needs its own width record.
- PCBUs who control a place of work must give WorkSafe at least 24 hours' notice of certain high-risk activity, so that deadline belongs on the schedule.
Before a rooftop HVAC tech climbs, set five numbers from WorkSafe New Zealand's guidance: roof pitch, ladder rating, platform width, crawl board width and notice.
The five figures are a roof pitch over 25° that calls for a roof ladder, ladders rated at not less than 120 kg, a platform at least 675 mm wide, crawl boards at least 450 mm wide with handrails, and at least 24 hours' notice to WorkSafe for certain high-risk work.
Net takeaways
When a roof ladder is needed on steep pitches
WorkSafe New Zealand's guidance says roof ladders should be used on roof pitches over 25°. That gives a dispatcher a number to plan around. Before a call is booked, the roof pitch should be recorded as a measured angle in degrees, not as a word such as "steep" or "low." Those words mean different things to an owner, a dispatcher and a tech. A figure can be compared directly with the 25° line, and the answer is either above it or not.
For a rooftop HVAC unit, the pitch matters most on the route between the access point and the unit. If it is 25° or less, the guidance does not call for a roof ladder, so the decision falls back to the measured pitch and the actual access route on that roof. A steep section that the tech only crosses briefly still counts as part of the route, so the planner should look at every section the crew will walk, not just the one nearest the truck.
Dispatchers should also ask whether the roof is reached by a fixed ladder or by a route that crosses the roof surface.
The wording is "should," which is guidance language rather than an absolute instruction for every case. A planner should treat it as the expected setup for the crew and settle the question at scheduling. Settling it early keeps the truck from arriving without the equipment the pitch calls for, and it avoids a decision on the roof edge with the tech already committed to the climb.
The practical step is simple. When the job is booked, write the pitch in degrees on the ticket, then mark one of two outcomes: roof ladder required, or not required under the 25° line. That one entry answers the question before anyone climbs. For the wider set of duties before a rooftop job, see duties to set before a rooftop condenser call.
Rating the ladders your crew carries
WorkSafe New Zealand's guidance says ladders and stepladders should be of industrial quality and be rated at not less than 120 kg. Two things are in that sentence. The first is the quality standard, which is industrial. The second is the rating floor. A ladder rated below that figure falls short of the guidance, whatever its condition looks like on the day.
The rating is the number a dispatcher can check without climbing anything. Before the tech leaves the shop, confirm that each ladder going on the job has a rating of at least 120 kg. Note the check on the ticket, following the Field Service Work Order Checklist for Dispatch Handoffs, so the owner can see that the equipment was confirmed for that call and not only assumed to be on the truck.
Ladders also move between vehicles, so a rating check done for one truck last month does not cover the ladder once it is loaded onto another. Treat the check as part of every loadout, and record which truck carries which ladder. That makes the ticket a loadout list, not only an address and a time.
The four planning figures from this guidance are gathered in the table below.
| Item | Figure | Planning check on the ticket |
|---|---|---|
| Roof ladder | Pitch over 25° | Measured pitch recorded; roof ladder required or not |
| Ladders and stepladders | Rating not less than 120 kg | Rating confirmed at loadout |
| Platform | Minimum width 675 mm | Width measured at the access point |
| Crawl board | Minimum width 450 mm | Width measured; handrails yes or no |
Setting the platform width before anyone steps out
WorkSafe New Zealand's guidance says the platform width needs to be a minimum width of 675 mm. The platform is the working surface the tech stands on while working at the unit. The figure is a minimum, so any measured width at or above 675 mm meets the guidance, and anything narrower does not.
A dispatcher cannot measure a platform from a phone call. The planning step is to ask the site contact, or have the tech check before departure, to measure the platform width at the access point. The measured figure goes on the ticket in millimetres. That way the crew knows before arrival whether the platform plan works, instead of finding out at the roof edge.
The width check should come early because it can change the rest of the job. If the platform is narrower than 675 mm, the crew needs a different access arrangement before the work starts. That is a decision for the planner, and it costs far less to make at scheduling than on the roof.
The figure is a width. A single measured figure keeps the ticket easy to review later, and it stops a width check from being mistaken for a full platform assessment.
Crawl board width and handrails
WorkSafe New Zealand's guidance says crawl boards should have a minimum width of 450 mm and should have handrails. That sentence gives two checks. The first is the minimum width of 450 mm. The second is the expectation that handrails are fitted.
The width check follows the same logic as the platform check. Write the measured width on the ticket next to the access route it serves.
A crawl board is not a platform, and the two minimums are not interchangeable. A route that uses a crawl board has to be planned against the crawl board figure, and a crew that brings a board chosen to suit the platform figure has not planned the crawl route. Each route on the ticket should carry the figure that governs it.
The planner should record yes or no for handrails on each crawl board route. If the route has no handrails, the ticket should say so, so the owner can see the gap before the crew is on the roof. A practical sequence for each route is to measure the width, compare it with the 450 mm minimum, then record handrails as present or absent.
Giving WorkSafe 24 hours' notice of high-risk work
WorkSafe New Zealand's guidance says PCBUs who control a place of work must provide at least 24 hours' notice to WorkSafe of certain high-risk activity. This is a timing rule as well as a duty. The notice must be given at least 24 hours before the planned start of the high-risk work, so the deadline has to be built into the schedule rather than remembered on the day.
The table below breaks that sentence into its three parts.
| Element | Requirement |
|---|---|
| Who gives notice | PCBUs who control a place of work |
| Notice period | At least 24 hours' notice to WorkSafe |
| Activity covered | Certain high-risk activity |
The first row names who has the duty. The planner should confirm which party controls the site before the call is booked. The second row is the 24-hour figure, which drives the schedule. The third row is the trigger, and the planner has to decide whether each rooftop job falls under it. A job marked as high-risk gets a notice deadline at least 24 hours before the planned start, written on the ticket with the time.
A job booked for a morning start needs the notice in place the day before at the latest, so the schedule should count backwards from the planned start. Where the site contact is not the controlling party, the planner should ask who will give the notice and get that answer in writing before the job is confirmed.
Worked example: one rooftop call
This illustrative call is not taken from a real job. The dispatcher records a measured roof pitch of 40° on the ticket. That is over 25°, so the ticket marks roof ladder required. The truck carries a ladder rated at 120 kg, which meets the minimum, and the loadout check is noted. The tech measures the platform at the access point and records 675 mm, which meets the minimum. The crawl board on the route is 450 mm wide, with handrails recorded as present. The notice to WorkSafe is set at least 24 hours before the planned start, so the planner counts back from that start time. The ticket now holds all five numbers before the crew leaves the yard.
Fleet cost pressures on rooftop service calls
Contractor Magazine's webinar page frames its subject as the need to understand the fleet cost pressures affecting HVAC, plumbing and electrical contractors. The page names HVAC contractors directly, which makes it relevant to a dispatcher who books rooftop units.
Fleet cost matters to roof access planning because every rooftop call draws on the same trucks, ladders, platforms and crew hours. When a truck sits in the shop, a roof job booked around it has to move. When a ladder is missing its rating or a platform is short of the width the job needs, the crew returns to the yard and the call takes a second trip. Those losses reduce service capacity and show up in the schedule before they show up on an invoice.
Owners can treat the fleet as part of the access plan. Before a rooftop call goes out, the dispatcher confirms that the truck carries the ladders and platform components the ticket calls for. Recording which vehicle carries which equipment also tells the team which trucks can take roof work on a given day.
Fleet pressure also argues against fitting roof work around breakdowns. If a truck goes out of service, a dispatcher who knows which roof jobs depend on its equipment can reassign those calls early. That keeps capacity steady without sending a crew up with equipment that is not on the vehicle.
The practical responses are local to each business: loadout checks, schedule buffers, and a clear record of what each truck carries. They follow from the planning logic in the sections above.
Preventive maintenance alerts before a roof visit
Gomotive says it can prevent costly breakdowns and reduce liability with preventative maintenance alerts. The page's address points to food and beverage fleets, so it describes a general fleet practice rather than HVAC guidance. The idea still carries over: an alert is a warning before a vehicle fails, which is useful to any team that plans roof visits around its trucks.
For a rooftop call the link is direct. A truck that breaks down on the way to a roof job means the ladders and platform parts arrive late or not at all. Preventive alerts give the team time to service the vehicle before it is needed. A dispatcher who sees an alert can move the roof job to another truck or hold the call until the vehicle is back in service.
The planning step can log alerts and service dates on the same record as the access ticket, so the team can show what was checked before a crew climbed.
A practical routine has three parts. First, log each vehicle's scheduled service and any alert it raises. Second, before assigning a roof call, confirm the truck carrying the access equipment has no open alert. Third, if an alert appears after a job is booked, reassign the job early. None of this needs a new system. It needs the alert to reach the person who books the calls.
Flat-rate pricing for high-ticket roof jobs
Workiz's guide on building a plumbing flat-rate price book makes a point about speed: this helps your crew close high-ticket service jobs immediately before competitors even have a chance to bid. The guide is written for plumbing, not rooftop HVAC, so its advice has to be translated. The principle that carries over is that a price the crew can quote on the spot lets the job close before another contractor gets to bid.
For roof work, a flat-rate book would cover the common rooftop call types the shop handles, so the dispatcher and tech can quote them without a separate site visit. That only works if access requirements are settled first. A price quoted on the phone assumes an access route. If the route turns out to need a roof ladder, a platform or a crawl board with handrails, the flat rate has to reflect that equipment, or the margin disappears on the day.
This is where the planning numbers connect to pricing. If the team records them on the ticket first, the price book can carry the access assumption as a line item, and the crew can quote with confidence.
A flat-rate book also needs review. A price set before the team knows its fleet and equipment costs can win work and still lose money. Owners should check high-ticket roof prices against the fleet and access costs described above before publishing them.
Which one should you pick?
The two options above answer different problems. Alerts protect the truck and the schedule. A flat-rate book protects the close rate. A team that has to choose one first should look at which problem is costing it more jobs right now.
| Option | What the source says it does | Where it fits a roof call |
|---|---|---|
| Preventative maintenance alerts | Prevent costly breakdowns and reduce liability | Keeps the access truck available on the day of the roof job |
| Flat-rate price book | Helps close high-ticket service jobs before competitors bid | Lets the crew quote a roof job on the spot once access is set |
Choose alerts first if roof jobs are slipping because trucks are unavailable for mechanical reasons. Choose the price book first if roof jobs are being lost because competitors quote faster. A simple test: look at the last few roof calls that slipped. If the cause was a truck out of service, start with alerts. If a competitor quoted first, start with the price book.
Both options still depend on the access record. Alerts help only if the team knows which truck carries the roof equipment. A price book holds up only if it knows which access route each job needs. The decision rests on the shop's own record of missed calls and lost bids.
One step to take today
Open the next rooftop ticket and check that it records five things: the measured roof pitch in degrees, the ladder rating, the platform width, the crawl board width with handrails recorded, and the WorkSafe notice deadline. A missing entry means the call is not ready to dispatch. For the wider picture, read fall protection checks before you dispatch to a roof.
Related guides: Extension ladder setup: 3 numbers for a service visit · Stairway and ladder access: 4 dispatch fields · 3 refrigerant changes to flag on a service dispatch ticket.
Questions readers ask
Do roof pitches over a set angle need a roof ladder?
WorkSafe New Zealand's guidance says roof ladders should be used on roof pitches over 25°. If a measured pitch is over 25°, a roof ladder is the expected equipment for that route. Record the pitch in degrees on the job ticket so it can be compared with the 25° figure before the crew travels.
What rating should ladders on a service truck have?
The guidance says ladders and stepladders should be of industrial quality and rated at not less than 120 kg. A ladder rated below that figure falls short of the guidance, whatever its condition. Check each rating before the truck is loaded and note the check on the job ticket.
How wide does a working platform need to be?
According to the guidance, the platform width needs to be a minimum width of 675 mm. Measure the platform at the access point and write the millimetre figure on the ticket before the crew leaves the yard, so a narrow platform is caught during scheduling.
What are the minimum requirements for a crawl board?
The guidance says crawl boards should have a minimum width of 450 mm and should have handrails.
How much notice must go to WorkSafe before high-risk work?
PCBUs who control a place of work must provide at least 24 hours' notice to WorkSafe of certain high-risk activity. Count backwards from the planned start and write the deadline into the schedule. Check each rooftop job against the high-risk category before the schedule is set.
Can a roof job be priced before the access route is known?
Not safely, because a quote made before the route is set can miss equipment the job needs. Workiz's guide is about closing jobs quickly rather than roof access, so record the pitch, ratings, widths and notice first, then price the job.
Does the Contractor Magazine webinar cover HVAC contractors?
Yes. The page lists understanding the fleet cost pressures affecting HVAC, plumbing and electrical contractors as its subject. The page describes a webinar topic, so anyone relying on it should look for cost figures in the session itself rather than assume them from the page.