Keep a short record of the access answers on the ticket once the job is done. Include the story count, the height or depth, the stairway or ladder used, and any hoisting method used. Note the person who confirmed each answer.
Record whether one stairway stayed clear while work was in the stairways, for any building with more than one stairway. Note who confirmed the stairway status and the time of the reply. Use the same field name on every ticket, so the next visit starts from the same record.
When intermediate vertical members, such as balusters, are used between posts, they must be not more than 19 inches (48 cm) apart, according to Washington State Legislature. Note on the ticket whether the stairway has balusters and whether the site reports their spacing. The ticket needs the site's report, not a measurement by the dispatcher.
Note whether the site reports the stairway as finished before the ticket closes. Ask the site contact to name the person who gave that finish report. Keep a copy of the report with the job record.
Update the ticket when the building changes, such as when a stairway is added or closed. A changed building needs a new access line, not an old note.
Your next step: add an access question to your dispatch checklist for any job in a building of two or more stories, and record the answer on the ticket.