3 state duties on paying and documenting subcontractors

WrenchQuarry Editorial Team · Published · 14 min read · How these guides are written

If you run the office for a contractor who hires subcontractors and day laborers in Ohio, Michigan or Florida, most of the work is familiar: bids, invoices, lien paperwork, and a check run on a regular schedule. What is easier to miss is that each state writes some timing and paperwork rules into law. A payment that goes out late, or a request that sits in an inbox, can carry costs beyond the invoice principal, as Ohio's interest provision shows.

Each state uses its own terms and its own triggers, so a habit that works in one state is not a safe guess in another. This post walks through the main duties for each state. The details come from the official text of each rule, and we link each one so you can read the full section yourself. Where a quoted passage stops short of a number or a deadline, we say so instead of filling the gap. Treat this as a field note for your own records, and check the full sections with your attorney before you rely on them for a specific job.

Net takeaways

  • Ohio Revised Code 4113.61 requires contractors, subcontractors, and lower tier subcontractors to pay laborers wages due within ten days of receiving payment on an application or retainage.
  • The contractor may reduce the amount paid by any retainage provision contained in the contract, invoice, or purchase order, or by amounts that may be necessary to resolve disputed liens or claims.
  • Michigan Compiled Laws 570.1110 requires the owner, lessee, or designee to provide a copy of the sworn statement within 10 business days after receiving a request from an entitled party.
  • Florida Statutes 255.071 ties complaint items to the amount remaining unpaid under the contract, the undisputed portion, and whether payment was received and not passed through within the statute's time limits.
  • The three states use different triggers and timelines, so a single records system logging pay dates, request dates, and disputed balances covers the records that all three duties depend on.

Ohio: pay laborers within ten days of getting paid

Section 4113.61 of the Ohio Revised Code sets a short clock on payment. Under the section, a contractor, subcontractor, or lower tier subcontractor shall pay a laborer wages due within ten days of payment of any application or request for payment or of taking in any retainage from an owner, contractor, subcontractor, or lower tier subcontractor (Ohio Revised Code 4113.61).

IssueWhat the text saysSource
Payment clockPay wages within ten days of payment of an application or request for payment, or taking in of retainageOhio Revised Code 4113.61
Retainage basisA retainage provision in the contract, invoice, or purchase orderOhio Revised Code 4113.61
Holdback basisAmounts needed to resolve disputed liens or claimsOhio Revised Code 4113.61
InterestCourt shall award the interest specified in those divisions, plus amount dueOhio Revised Code 4113.61

The trigger is the money coming in. The ten days start when your company is paid on an application or request, or when retainage is received. They do not start when the laborer finished the week, or when the office gets around to the check run. That means the office needs a log that records the date each pay application was paid and the date each retainage release arrived. Without that log, nobody can show when the ten days began.

The section also applies down the chain. It names subcontractors and lower tier subcontractors alongside the contractor, so a subcontractor who hires its own crew carries the same ten-day duty. If you are the prime, it is reasonable to ask your subs to confirm when they pay their own laborers and to keep those confirmations with your job file. That request is a practical habit. The duty itself sits in the statute.

Retainage deserves its own attention. The same section says the contractor may reduce the amount paid by any retainage provision contained in the contract, invoice, or purchase order between the contractor and the subcontractor or material supplier, and may withhold amounts that may be necessary to resolve disputed liens or claims involving the work or labor performed or material furnished by the subcontractor or material supplier (Ohio Revised Code 4113.61).

Check where the retainage terms live. The quoted text names three places a retainage provision can appear: the contract, the invoice, and the purchase order between the contractor and the subcontractor or material supplier. If the subcontract is silent on retainage but a purchase order carries a retainage line, the file should show which contract, invoice, or purchase order the reduction relied on, and any reading of overlapping documents should be confirmed with counsel. A reduction that points to no document is the weakest position to be in.

Two points come out of that language. First, a retainage reduction has to tie back to a retainage provision in the contract, invoice, or purchase order. Second, the other basis is an amount that may be necessary to resolve a disputed lien or claim. A figure held back with no written reason is hard to defend. When you hold money back, write down which provision or which dispute it rests on, and put that note in the job file before the check run, not after someone calls about the shortfall.

The last piece is interest. The section says that if a court finds in a civil action that a contractor, subcontractor, material supplier, lower tier subcontractor, or lower tier material supplier has not made payment in compliance with those divisions, the court shall award the interest specified in those divisions, in addition to the amount due (Ohio Revised Code 4113.61). In practice, a late payment can carry a cost beyond the principal. The quoted text points to interest specified in other divisions of the section, so pull those divisions before you tell anyone what interest would apply. This post does not give a rate or an amount, because the quoted text does not state one.

As quoted, the interest award is triggered when a court finds noncompliance in a civil action, which means the dispute would turn on records. Dated pay applications, dated retainage records, and written reasons for any holdback are the documents that would show whether a payment was made on time and why. If those records exist before the dispute starts, the office is in a much stronger position than one trying to rebuild them after a lawsuit is filed.

Michigan: answer a sworn statement copy request within 10 business days

Section 570.1110 of the Michigan Compiled Laws covers the sworn statement and who may ask for a copy of it. The part office leads most often need is the copy request. The section says that if a subcontractor, supplier, or laborer who is entitled to notice that the sworn statement was received makes a request, the owner, lessee, or designee shall provide the requester a copy of the sworn statement within 10 business days after receiving the request (Michigan Compiled Laws 570.1110).

ElementWhat the text saysSource
Who may askSubcontractor, supplier, or laborer entitled to notice that the sworn statement was receivedMichigan Compiled Laws 570.1110
DeadlineWithin 10 business days after receiving the requestMichigan Compiled Laws 570.1110
DeliverableOwner, lessee, or designee provides a copy of the sworn statementMichigan Compiled Laws 570.1110
Direct paymentsSubsequent direct disbursements need not be preceded by the 5-day notice unless the owner returns to paying all sums to the general contractorMichigan Compiled Laws 570.1110

Three parts of that sentence matter for daily work. The first is who may ask. The requester has to be a subcontractor, supplier, or laborer entitled to notice that the sworn statement was received. So the office needs to know, for each job, which parties sit in that category. A list kept with the job file, showing each party and the date it was notified, answers that question before anyone has to search through email.

Notice and copy requests are separate events. The quoted sentence describes a party that is entitled to notice of the sworn statement's arrival and then makes a request, so the notice record and the request record are two different facts. Keep them apart in the file, so that each can be answered on its own without digging through the other.

The second is the clock. The period is 10 business days, not calendar days, and it runs from the day the request is received. Log the date every request arrives, even when it came in by phone or reached a field superintendent who forwarded it several days later. A forwarding delay is the kind of gap that makes a deadline hard to defend. A practical habit is to write the response date on the request itself, so a copy sent late in the window with a short transmittal note is easy to show later.

The third is the deliverable. The owner, lessee, or designee must provide a copy of the sworn statement. The section asks for the document, so a verbal summary does not satisfy what it describes. Keep a current copy of the sworn statement in the job file so it can go out quickly, and record when and how it was sent.

The section also covers direct payments, and this part is easy to overlook. The text says that subsequent direct disbursements to lien claimants need not be preceded by the 5-day notice provided in this section unless the owner first returns to the practice of paying all sums to the general contractor (Michigan Compiled Laws 570.1110). The notice step therefore depends on how the owner pays. If the owner has switched to paying lien claimants directly, the quoted text says later direct payments need not get the 5-day notice first, unless the owner goes back to paying the general contractor for all sums. A change in payment method is something to record with a date, because it changes which notice step applies.

Florida: track what is unpaid and what is undisputed

The statute on this topic in Florida is Section 255.071 of the Florida Statutes. Its text lists items that appear in a complaint, and it ties the procedures and remedies to the labor, services, or materials a person provided. Three of those items are concrete enough for an office to plan records around.

ItemWhat the text saysSource
Unpaid amountsAmount remaining unpaid pursuant to the contract and the amount undisputedFlorida Statutes 255.071
Payment timingPerson received payment and failed to pay within the statute's time limitationsFlorida Statutes 255.071
RemedyPrejudgment attachment under chapter 76 requirementsFlorida Statutes 255.071
Timing triggerWhichever last occurs, before procedures and remedies applyFlorida Statutes 255.071

The first is amounts. The section lists the amount that remains unpaid pursuant to the contract and the amount thereof that is undisputed (Florida Statutes 255.071). The word undisputed matters. Your job payment record should separate what is still owed under the contract from what is in dispute, with a reason written next to each disputed item. If both numbers sit in one column, you will struggle to state the undisputed figure when someone asks for it.

The second is payment received. The section refers to a person against whom a complaint was filed having received payment on account of the labor, services, or materials described in the complaint, and having failed, as of the filing date, to make payment within the time limitations set forth in the statute. Practically, the office should be able to show which owner payments were made for which labor or materials. Tag each payment to the subcontractor or laborer it covered. The quoted passage is cut off before those time limitations are named, so read the full section before you act on any date.

The third is attachment. The section refers to prejudgment attachment against the person who received the payment, in accordance with each of the requirements of chapter 76 (Florida Statutes 255.071). That remedy reaches the person who received the payment, which is one reason to keep payment records clean and matched to the work they cover. Attachment has its own requirements under chapter 76, and this post does not describe them.

The section also has a timing sentence that the quoted fragment does not finish. It refers to whichever last occurs, then ties entitlement to procedures and remedies to that point. The quote stops before naming the events. Do not take a deadline from this post. Read the full section and confirm which events set the dates for your job.

When a subcontractor asks where it stands, a written statement that shows the contract amount, the payments received and the work they covered, the undisputed balance, and the disputed balance with reasons gives the office one document that lines up with the items the section lists. Send it in writing and keep a copy, so the figures given to the sub and the figures in the payment record stay the same.

The items listed in that statute describe what a complaint contains, so the office's records are what let anyone answer them later. A simple register for each job, with columns for the contract amount, payments received and the work they covered, the undisputed balance, and the disputed balance with a reason, covers each item without anyone rebuilding the history from memory.

Comparing the three rules

The three rules do not line up neatly, which is why one list of dates is not enough. The table here compares what each quoted passage covers and what timing, if any, the quoted text states.

StateWhat the duty coversTiming in the quoted textSource
OhioPaying a laborer wages dueWithin ten days of payment of an application or request for payment, or taking in of retainageSection 4113.61
MichiganGiving a requester a copy of the sworn statementWithin 10 business days after receiving the requestSection 570.1110
FloridaAmounts and payments listed for a complaintNone stated in the quoted passage; the section refers to time limitations set elsewhereSection 255.071

The overlap is in the records. The Ohio ten-day clock depends on when money came in, the Michigan copy request depends on when the request arrived, and the Florida undisputed amount depends on how the balance splits between disputed and undisputed. An office that tracks those three facts for every job covers most of what the three quoted passages ask for, even before anyone reads the statutes in full.

In Ohio, the concern is speed after you get paid. In Michigan, the concern is answering a request with a copy. In Florida, it is documenting what is owed and what was paid. One records system can serve all three if it logs the date you were paid, the date each request arrived, which amounts are disputed, and which payments went to which work.

Pick one open job in each state and check three things. Find the date each pay application was paid, the date any copy request arrived, and whether the unpaid figure splits cleanly into undisputed and disputed amounts. If any of those answers lives only in someone's memory, fix that first, because it is the answer you will need on the day someone asks.

Questions readers ask

How long does an Ohio contractor have to pay laborers after receiving payment?

Under Ohio Revised Code 4113.61, a contractor, subcontractor, or lower tier subcontractor must pay a laborer wages due within ten days of payment of any application or request for payment, or of taking in any retainage. The clock starts when the money comes in, not when the work was finished.

What documents must support a retainage holdback in Ohio?

A retainage reduction must tie back to a retainage provision contained in the contract, invoice, or purchase order between the contractor and the subcontractor or material supplier. The other basis is an amount that may be necessary to resolve disputed liens or claims involving the work or labor.

When does a court award interest for late payment under Ohio Revised Code 4113.61?

If a court finds in a civil action that a contractor, subcontractor, material supplier, lower tier subcontractor, or lower tier material supplier has not made payment in compliance with those divisions, the court shall award the interest specified in those divisions, in addition to the amount due. The rate is stated in other divisions of the section, not in the quoted text.

Who can request a copy of the sworn statement in Michigan, and what is the deadline?

A subcontractor, supplier, or laborer who is entitled to notice that the sworn statement was received may make the request. The owner, lessee, or designee must provide a copy within 10 business days after receiving the request.

Does Michigan require a 5-day notice before direct payments to lien claimants?

Subsequent direct disbursements to lien claimants need not be preceded by the 5-day notice unless the owner first returns to the practice of paying all sums to the general contractor. Record any change in payment method with a date, because it changes which notice step applies.

What amounts does Florida Statutes 255.071 list?

The section lists the amount that remains unpaid pursuant to the contract and the amount thereof that is undisputed. Keep these as separate figures in the job payment record with a reason written next to each disputed item.