Washington disclosure statement: 2 contracts it skips

WrenchQuarry Editorial Team · Published · 9 min read · How these guides are written

Washington's disclosure statement requirement does not apply to contracts authorized under chapter 39.04 RCW or to contracts where one contractor hires another contractor. Both carve-outs come from RCW 18.27.114(5).

  • Contracts authorized under chapter 39.04 RCW are outside the section entirely.
  • When your customer is a fellow contractor, no disclosure statement is required on that contract.
  • The carve-out applies to the disclosure duty itself; the section does not reach those contracts.
  • The lien-proof link in subsection (4) and the infraction in subsection (6) do not attach to a skipped contract.
  • On a contractor-to-contractor job there is no consumer for the subsection (3) registration-change notice.

What the Washington disclosure statement actually says

The disclosure statement under RCW 18.27.114 is a written paper you hand a consumer. It states that your contractor registration with the state of Washington is active, gives your registration number, and states the bond or deposit you posted with the state. It also carries two warnings in the statute's own words: that the bond or deposit might not be enough to cover a claim from the work under that contract, and that the same bond is not reserved for that one customer because it covers all of your work.

That statement matters to your wallet in a second, less obvious way. RCW 18.27.114(4) says you cannot bring or maintain a lien claim under chapter 60.04 RCW on a contract covered by the section unless you allege and prove you gave the customer a copy of the disclosure statement as subsection (1) requires. Skip the paper and your lien claim runs into a statutory wall you have to prove your way past.

The section also makes skipping it a ticket. Failure to comply constitutes an infraction under that chapter.

You also owe a second notice later. If your registration expires, or the department revokes or suspends it, you must tell the consumer while the contract is still open, before completion or another end of the job. RCW 18.27.114(3) sets that duty.

Two contracts sit outside the section. Subsection (5) names them, and that carve-out is the point of this post.

Which two contracts the rule skips

Under Washington's rule, the disclosure requirement does not apply to contracts authorized under chapter 39.04 RCW, and it does not apply when a contractor contracts with another contractor. Both carve-outs sit in RCW 18.27.114(5).

Read that second one closely, because it is the one field work runs into. When your customer is a contractor rather than a consumer, the disclosure statement is not the job. No paper, no lien-proof tied to the paper, no infraction for missing it — on that contract.

The first carve-out points at a different kind of job entirely. A contract authorized under chapter 39.04 RCW sits outside the section, so handing a disclosure statement on such a contract is not the duty the statute sets.

The disclosure statement still governs your consumer contracts.

Contract typeDisclosure statement required under RCW 18.27.114(5)?
Contract authorized under chapter 39.04 RCWNo
Contractor contracting with another contractorNo
Contract with a consumerNot exempt under subsection (5)

Table facts drawn from RCW 18.27.114(5) only; other subsections set what the statement itself requires.

Who counts as another contractor

RCW 18.27.114(5) ends the duty when one contractor contracts with another contractor. That phrase does the work of a whole workflow decision on site.

Picture a concrete pour booked by a framing crew. The framing crew is your customer. The framing crew is itself a contractor. Under that carve-out, the disclosure statement duty does not reach your contract with them.

Picture the same day from the other direction: a homeowner calls you directly for a patio. The homeowner is not a contractor. You are the contractor. The disclosure statement duty holds on that contract.

The statute does not restate the word "consumer" in subsection (5); it works by naming the counterparty as a contractor. So the practical read is: who is on the other side of your signature? If it is a fellow contractor, the section is off. If it is a homeowner standing in for their property, the section is on.

Keep the paperwork straight in your files either way.

The two carve-outs never overlap with each other on a residential patio. The carve-outs matter when your book mixes homeowner work with crew-to-crew or public-works-flavored work.

What still binds you on the skipped contracts

The department can revoke, suspend, or let your registration lapse. RCW 18.27.114(3) only requires the consumer notice when a consumer is on the other side and the registration moves before the contract ends.

So on a contractor-to-contractor job, the notice duty in subsection (3) has no consumer to notify. On a chapter 39.04 RCW authorized contract, the section does not apply at all.

The lien consequence also has a scope. RCW 18.27.114(4) ties the proof you must allege and prove to a contract "to which this section applies." On a contract subsection (5) skips, that tie is gone.

The infraction language in subsection (6) reads as failure to comply with "this section." A contract the section does not reach cannot be a failure to comply with it, on that contract.

This is the sharp edge of the carve-out: it strips the disclosure paper.

What the statement must carry when you do hand it over

The statute's own text gives you a fill-in form for the line about your registration and bond. The sentence starts with "This contractor is registered with the state of Washington, registration no." and leaves a blank for your number. It then says you posted a bond or deposit with the state, with a blank for the amount, for the purpose of satisfying claims against you for breach of contract, including negligent or improper work in the conduct of your business.

A second line follows with its own blank: "The expiration date of this contractor's registration is . . . . .." That blank is where your registration expiry date belongs.

Two warnings ride along with those blanks. One says the bond or deposit might not be sufficient to cover a claim arising from the work done under that contract. The other says the bond or deposit is not for the customer's exclusive use, because it covers all work you perform.

Fill every blank before the paper leaves your hand. An empty registration number or expiry line is a disclosure statement that does not disclose.

The department produces model disclosure statements for contractors and customers to use. Ask the department for the current model before you print your own run.

The paper's job in your lien file

A lien claim is your lever when a customer will not pay. On a contract the section covers, RCW 18.27.114(4) puts the disclosure statement copy inside the claim's proof. You must allege it and prove it.

That makes the disclosure statement a lien document as much as a consumer document. It lives in the same folder as your lien paperwork.

On a contract subsection (5) skips, that proof link does not exist. Your lien claim under chapter 60.04 RCW is not gated by the disclosure statement on that contract.

Do not read that as a green light to skip filing steps elsewhere. Chapter 60.04 RCW sets its own rules for liens. This post only traces what RCW 18.27.114 adds to them.

For a dispatcher booking crew work, the practical point sits in your handoff file: which contracts carry the disclosure paper and which do not, marked before the crew rolls.

The three blanks you must fill before you hand the paper over

The blanks in the statute's model sentence are not decorative; they are the disclosure.

Registration number. The sentence that opens with your Washington registration leaves a blank for the number itself. An unfilled number tells the customer nothing they can check.

Bond or deposit amount. The same sentence leaves a blank for the amount you posted with the state, tied to its purpose: satisfying claims against you for breach of contract, including negligent or improper work in the conduct of your business.

Registration expiry date. The second line leaves a blank for the expiration date of your registration. Fill it with the date the department gives you.

Three blanks, one paper. Any blank left open is a hole in the disclosure the statute asks you to make.

When your registration moves mid-job

A registration that expires, revokes, or suspends while a consumer contract is still open triggers a notice duty. RCW 18.27.114(3) requires you to tell that consumer before the contract reaches completion or another end.

The clock on that notice runs to the end of the contract with the consumer, not to the date the department acts. Tell them while the job is open.

Subsection (5)'s carve-out for contractor-to-contractor work shapes this too: there is no consumer on the other side to notify on such a contract. The section's notice duty has nothing to attach to on a contract the section does not reach at all.

Ask the department directly how a move in your registration status should reach a consumer on a covered contract, so your answer sits in writing before a job starts.

What the department hands you to stay in line

The department produces model disclosure statements and public service announcements that carry the information contractors and their customers need to comply with the section. That production duty sits in RCW 18.27.114(7).

Start with the model. Build your paper from it rather than from memory.

The department's material also reaches your customer, which helps when a homeowner asks why they are looking at a bond warning in capital letters.

Use the model to keep your blanks in the right spots and your warnings in the statute's wording. Then file the copy you handed over with the rest of that job's paperwork.

How to mark a contract as skipped or covered

Mark the contract type before the crew rolls. The carve-out in subsection (5) turns on two facts you already know at booking: whether the contract is authorized under chapter 39.04 RCW, and whether your counterparty is a contractor.

If either fact is true, the disclosure statement duty does not reach that contract. Mark it skipped and keep the registration facts in your file anyway.

If neither fact is true, and a consumer stands on the other side, the duty holds. Print the model, fill the three blanks, hand it over, and file your copy.

A dispatcher's sheet with one column for contract type and one column for disclosure status keeps the two carve-outs visible at the moment of booking, not at the moment of a dispute.

Field notes

Keep the model statement with your contract examples so the three blanks get filled on every covered job.

File the copy you handed over in the same folder as the contract and any lien paperwork for that job.

Mark crew-to-crew contracts and chapter 39.04 RCW authorized contracts as skipped on the booking sheet, with the reason in one line.

Watch your registration status while consumer contracts are open. The notice duty runs until the contract ends.

Carry the two warnings in the statute's wording on any paper you build yourself.

When a contract type sits outside what this post covers, ask the department before the crew rolls.

Related guides: Florida contractor delays: 2 timing windows to check · Responsible contractor verification on bids: 2 records · Washington final-paycheck deductions: 3 loss types.

Sources

More field guides