- Write the exact years (for example, 1961–1990) into the quote, not just the word "normal."
- For 1981–2010, state the limit: only monthly maximum and minimum temperatures are provided, and cite the Normals Calculation Methodology 2020 document.
- For 1991–2020, record the version you read and do not attach a version number to a period unless your own source says so.
- Keep the weather history line separate from the schedule and price so each can be revised on its own.
A seasonal quote that relies on weather history should say which history it used. The sources for this post describe weather normals as 30-year averages of meteorological quantities, and they name specific periods you can write into a quote. This post covers three of them, what the published pages say about each, and how to write the reference so the next reader can check it.
Key Takeaways
Name 1961–1990 by its years
Name 1961–1990 by its years whenever your quote relies on that period, rather than calling it "the normal." The World Meteorological Organization requires each member nation to compute 30-year meteorological quantity averages at least every 30 years. The NCEI U.S. Climate Normals page quotes that requirement with 1931–1960, 1961–1990, and 1991–2020 as examples.
| Item | What the requirement says | Applies how | Source |
|---|---|---|---|
| Computation interval | At least every 30 years | Sets how often averages are computed | NCEI |
| Recommended update | Each decade | To incorporate newer weather stations | NCEI |
| Choosing the period | Your decision | The quote should state it | NCEI |
Write the years in the quote itself. A reader who sees only the word "normal" has to guess which years you meant. A reader who sees the years can look up the same years elsewhere and compare your figures against theirs.
The requirement describes how often the averages are computed. It does not decide which years a particular quote should use. Choosing the period is your decision, and the quote should state it. When a quote names 1961–1990, it tells the reader that the averages come from those years and nothing more, so it should not imply that the figures reflect the current climate.
Name 1981–2010 only with the limit the NCEI page states
The NCEI page says, "These new 1981–2010 temperature calculations are not a complete set of temperature related normals; only monthly maximum and minimum temperatures are provided." If a seasonal quote uses this period, say that the figures are monthly maximum and minimum temperatures. Anything else the quote relies on needs a source of its own.
| Aspect | What the NCEI page says | What your quote should do | Source |
|---|---|---|---|
| Completeness | Not a complete set of temperature related normals | State the limit | NCEI |
| Measures provided | Only monthly maximum and minimum temperatures | Name these figures explicitly | NCEI |
| Method document | Normals Calculation Methodology 2020 | Cite the document name | NCEI |
| Other measures | Rain or wind estimates need their own source | Name a separate source | NCEI |
The same page says the changes are summarized in the Normals Calculation Methodology 2020 document, along with additional technical documentation released with 1981–2010 Normals. Put that document's name in the reference when you cite this period, so a reader knows where the method is described.
Because this set covers only maximum and minimum temperatures, a quote that depends on other measures should not borrow this period for them. A rain estimate or a wind estimate needs its own source, named separately, so the reader can tell which figure came from where.
Name 1991–2020 together with the version you used
Name 1991–2020 together with the version of the data you used. The period appears in the WMO examples on the NCEI page, and the same page refers to a 1991–2020 station-based U.S. set. On versions, the page says: "Version 1.0.1 reflects changes in the daily, monthly, seasonal, and annual normals at a total of 23 stations."
A version number tells a reader which release you used. The line quoted above does not say which period that version applies to, so do not attach it to 1991–2020 unless your own source says so.
The page also includes a note that begins by describing the year after the initial release of the 1991–2020 station-based U.S. set. That is one more reason to record which release you read, because a figure taken from the first release and a figure taken from a later one may not match.
Compare the three periods at a glance
The table below compares the three periods using only what the NCEI page says.
| Period | Where the NCEI page names it | What the page says |
|---|---|---|
| 1961–1990 | Example in the WMO requirement | Listed among examples |
| 1981–2010 | New temperature calculations | Not a complete set of temperature related normals; only monthly maximum and minimum temperatures are provided |
| 1991–2020 | Example in the WMO requirement; station-based U.S. set | Listed among examples; the page refers to a 1991–2020 station-based U.S. set |
Worked example: one weather line in a quote
A quote for a two-day job in January needs one weather line. Write it as: "Weather history: 30-year average, 1981–2010, NCEI U.S. Climate Normals; January monthly maximum and minimum temperatures; method as described in Normals Calculation Methodology 2020." That line names the period, the source, the exact figures used, and the method document in one place. A reader can open the NCEI page, find the same period, and compare. If the job moves to February, only the month in that line changes; the schedule and price lines stay as they are.
Read an average as a description of the past
A weather normal describes what the weather has typically looked like over a fixed block of years. It does not predict what the next month will bring. That distinction matters for a seasonal quote, because a customer may read a sentence about historical averages as a promise about the coming weeks. Write the quote so the average is clearly labeled as history, and so the price and schedule are clearly labeled as your plan built on that history.
The difference also shows up in the arithmetic. An average taken over a long period can hide a short run of unusual days. A crew that plans for the average may still face several cold or wet days in a row. The quote does not need to predict those days. It needs to say which assumption it used, so that when the weather departs from the average, everyone can see which part of the estimate is affected.
Before you send a quote, read it once as the customer would. Ask whether a sentence about historical figures could be taken as a forecast. If it could, reword it so the source and the assumption are visible in the same sentence.
Use the months the job actually runs in
Use only the monthly figures for the months the job runs in. The NCEI page describes monthly maximum and minimum temperatures for the 1981–2010 calculations, so a quote for a single month should use that month's figures and not an annual figure. If the job spans two months, name both and say how you combined them. Writing "the season" without naming months leaves the reader unable to tell which part of the year the estimate covers.
Start and finish dates deserve the same care. A job that begins at the end of one month and runs into the next may be affected by different parts of the record. The quote should state the dates it covers, then name the monthly figures for each month in that span. If your own schedule shifts, the reader can see which month's assumption changed.
When you write the monthly figure into the quote, put the month, the period, and the type of figure in the same phrase. A phrase such as "January, 1981–2010, monthly minimum temperature" tells the reader exactly what was used. A phrase such as "winter average" does not, and it invites the reader to ask which average you meant.
Handle cold work with two separate checks
Cold weather affects outdoor work in two ways, and a quote should treat them separately. The first is the official weather picture for your area. The National Weather Service says, "Criteria for issuing official NWS Extreme Cold Warnings and Cold Weather Advisories are set locally." That means a warning in one place may not match the threshold used in another. Look up the criteria for your own area rather than assuming a single standard.
| Check | What the source says | Why it matters for a quote | Source |
|---|---|---|---|
| Official warning criteria | Set locally | A warning in one place may not match another | National Weather Service |
| Cold-stress effect | Can vary across different parts of the country | The crew's home region shapes how cold is handled | NIOSH |
| Mild-winter regions | Near freezing temperatures are considered factors for cold stress | Relevant for crews unaccustomed to winter weather | NIOSH |
| Quote handling | State which crew is assumed and extra time for breaks | Shows how you handled the factor | NIOSH |
The second check is the effect of cold on the people doing the work. The NIOSH page says, "For outdoor workers, what constitutes cold stress and its effects can vary across different parts of the country." The same page says, "In regions where workers are unaccustomed to winter weather, near freezing temperatures are considered factors for cold stress."
That second point is useful for a quote written in a region with mild winters. A crew from an area with long cold seasons may handle a given temperature differently from a crew that rarely works in it. A quote can say which crew it assumes and whether the plan includes extra time for breaks, warming, or changes to the schedule. Those choices are yours to make and state. The NIOSH page describes the factor, and the quote shows how you handled it.
Keep the weather history apart from the schedule
Keep the weather history on its own line, separate from the crew schedule and the price. Write it as a stated assumption: the period or source it came from, and the part of the job it applies to. The separate line lets a dispatcher or customer see which assumption to revisit when the job runs into a stretch the quote did not plan for, without rereading the whole estimate. For a related handoff pattern, see Field Service Work Order Checklist for Dispatch Handoffs.
This separation also makes the quote easier to revise. If the schedule changes because of a supplier delay, the weather line does not need to change. If the weather pattern turns out to differ from the average, the schedule line does not need to change either. Keeping the two apart stops a single problem from forcing a rewrite of the whole document.
Tell the customer what would change the plan
A seasonal quote is more useful when it names the conditions that would change the plan. For a weather-dependent job, that might be a stretch of cold, a period of heavy rain, or a day when the local cold-weather criteria are met. Name the condition, say what the plan does when it occurs, and say who decides. A line such as "If the local advisory applies on a scheduled work day, the crew will move that task to the next suitable day and the completion date will be confirmed in writing" gives the customer a clear rule without promising a result the weather cannot guarantee.
Customers often read a historical average as a claim about their own job. A short statement of the conditions reminds them that the quote is an estimate built on stated assumptions, and that the assumptions have limits.
Keep a short revision log
Keep a short note of which period and version each seasonal quote used. Record the date you looked at the source, the name of the page, and the figures you took from it. The log does not need to be long. Its job is to let you find the basis for a quote months later without reconstructing it from memory.
When you return to a job, the log tells you which figures to compare, so you are not working from recollection. If a dispatcher takes over the account, the log lets them see what the original estimate assumed. It also helps when a customer asks why a schedule changed, because the answer can point to a specific line rather than a general sense that the weather was different.
Recheck the quote when a newer period or version is published
Recheck the quote when a newer period or version is published. The WMO requirement recommends an update each decade, in part to incorporate newer weather stations. A quote written against an older period is not wrong on the day it was written, but it may be out of step with the current series. Check the NCEI page when you prepare a new seasonal quote, and note any change in the period or version you use.
Recheck older quotes only when they are still active or when a customer asks for an update. There is no need to revise every past estimate each time a new release appears. Focus on the jobs that are still ahead of you.
Write the reference so a reader can check it
Write the period, the years, the source, and the version in one line in the quote. For example: "Weather history: 30-year average, 1961–1990, NCEI U.S. Climate Normals." Link the page you used, not only its name, and note when you read it. A reader who can open the same page and find the same figures has a reason to trust the quote, and one who cannot has a clear question to ask.
Keep the wording plain. A reference that uses the same terms as the source is easier to check than one that paraphrases them. If the source uses the phrase "monthly maximum and minimum temperatures," write that phrase in the quote rather than a shorter label that could mean something else.
If you used more than one period in the same quote, give each its own reference line. A single line that lists two averages without separating them makes it hard to tell which figure supports which part of the schedule. Separate lines let the reader check each assumption on its own, and they let you update one reference without touching the others.
Next step: add one weather line today
Open your next seasonal quote and add one line that names the period, the source, and the figure type in plain words, such as "Weather history: 30-year average, 1961–1990, NCEI U.S. Climate Normals." Check that the months named match the job's dates. That takes a few minutes and needs no signup or purchase.
Related guides
Common questions
Which weather normal period should I name in a seasonal quote? Name whichever 30-year period your figures came from, such as 1961–1990, 1981–2010, or 1991–2020, and write the years into the quote rather than the word "normal."
What limit applies to the 1981–2010 period? That set is not a complete set of temperature related normals; only monthly maximum and minimum temperatures are provided.
Do I need a version number in the reference? Record the version you read when the source names one, and do not attach a version number to a period unless your own source says so.
Should the weather line sit with the schedule and price? No, keep it on its own line as a stated assumption so it can be revised without rewriting the schedule or price.